Sector

Data Centers

Electrical design and protection studies for hyperscale, colocation and AI data centers — so the IT load never notices a fault and engineers can work safely.

The short version

Uptime is an electrical design problem

Every minute of downtime puts revenue, service agreements and client trust at risk. We engineer data center power systems — and prove them through studies — so a single failure never reaches the IT load.

Our work covers the full chain: utility intake, MV ring, UPS and battery rooms, standby generators, earthing and protection, organised around what each approval body needs to see before energisation.

Engineering context

Why data center power is different

A data center electrical system has two jobs that pull against each other: it must never interrupt the IT load, yet it must let engineers isolate, test and maintain equipment safely. Both depend on studies being finished before live switching begins.

At the intake, the transmission utility sets rules for fault contribution, power quality, protection and transformer energisation — at 110, 132 or 220 kV in most Indian states — and expects studies to show compliance.

Within the campus, operators need arc flash labels, a verified earthing system, coordinated protection and a switching analysis for every normal, generator and maintenance mode.

Scope snapshot

What data center projects ask of us

  • Intake studies at 110–220 kV
  • Switching sequence analysis
  • Transformer energisation
  • AC & DC arc flash
  • IEEE 80 earthing design
  • Protection grading
  • Surge & insulation checks
  • Harmonics & power quality
Critical power

Studies that clear the way to energisation

01

Utility interface studies

Load flow, fault level and protection grading at the 110, 132 or 220 kV intake and the 33 kV campus network, prepared for utility submission.

02

Switching sequence analysis

Proof that every planned transfer, fault, DG start and restoration sequence keeps equipment within rating and staff safe.

03

Transformer energising

Inrush, voltage sag and relay behaviour when large transformers are switched in on a campus that is already carrying load.

04

AC & DC arc flash

Incident energy and PPE requirements for switchboards, UPS systems and battery strings, with labels for each location.

Resilience

Keeping faults local and people safe

01

Selective protection

Settings that keep a fault local whether the campus is on utility, on generators or in a maintenance configuration.

02

Earthing & bonding

Earth grids for HV yards and data halls, equipotential bonding and touch and step checks to IEEE 80.

03

Harmonic control

Assessment of UPS rectifiers, drives and IT loads against IEEE 519, with filtering where limits are at risk.

04

Surge & insulation

Arrester selection, switching surge checks and insulation levels for HV and MV equipment.

Power architecture

Built for availability and growth

01

Redundant topologies

2N and N+1 architectures and SLDs matched to the availability target and concurrent maintenance needs.

02

UPS, batteries & generators

Ratings for UPS modules, battery autonomy, generator sets and fuel based on IT and cooling load profiles.

03

High-density distribution

MV networks, LV switchboards, busways and rack feeds sized for AI and GPU densities.

Codes & software

Recognised by utilities and operators

IEC 60909IEEE 1584IEEE 80IEEE 519IEC 60071IEC 62305CEA RegulationsETAPPSCADDIgSILENT PowerFactoryCDEGS
Questions

Data center teams often ask

What studies come before energising a data center?

Usually intake load flow and fault level, protection grading, transformer energisation, earthing and arc flash. Many utilities also ask for a power quality assessment of the UPS and IT load.

Do you check every operating mode in a 2N or N+1 design?

Yes — utility, generator, UPS-on-battery and each maintenance arrangement are modelled so protection and ratings hold in all of them.

Can you handle AI and GPU halls?

Yes. We size transformers, busways and feeders for high rack densities and study the harmonics and load steps GPU clusters create.

Our campus is being built in phases. Is that a problem?

Not at all. We model the full campus up front and update the studies at each phase so early choices don't box in later expansion.

Get in touch

Building or expanding a data center?

Share the IT load, redundancy target and project stage — we'll outline the studies and design you need.

Request a proposal

Tell us about your project and we'll respond with scope, timeline and next steps.