Fire detection and suppression design for substations, control buildings, data centers and industrial plants — sized to the actual risk and water demand of each site.

Overview

Life safety designed around the actual risk

Fire protection systems are sized from the specific fire risk and water demand of each site, rather than from a generic checklist.

Our fire system design is coordinated with the electrical layout and building occupancy developed for the rest of the project.

In detail

What fire fighting system design involves

Each area of a facility needs a suppression strategy matched to its particular hazard, rather than one approach for the entire site.

Water demand is calculated from the hazard class of each area, and the hydrant network, sprinkler system and detection are matched to the space they protect.

Control rooms, switchgear rooms and data halls are protected by clean agent or water mist systems, coordinated with HVAC shutdown and electrical isolation.

Scope snapshot

Fire protection scope

  • Fire risk assessment
  • Hydrant systems
  • Sprinkler systems
  • Fire detection & alarm
  • Fire water tanks & pumps
  • Clean agent & water mist
  • Transformer protection
  • Fire NOC documentation
Detection & suppression

The fire protection scope

01

Hydrant & sprinkler design

Hydrant and sprinkler networks sized according to the hazard classification, verified by hydraulic calculations and routed clear of roads and buried services.

02

Fire detection & alarm

Detector types selected to suit each environment, with alarm zoning that identifies the affected area quickly to support a fast response.

03

Water demand & storage

Fire water demand based on the largest single hazard plus hose allowance, with a dedicated fire water tank and pump set where the mains supply is not sufficient.

04

Special suppression systems

Clean agent and water mist systems for electrical rooms, designed with attention to occupant safety, ventilation shutdown and electrical isolation.

Compliance

Codes and approvals

01

NBC, TAC & NFPA compliance

Design in accordance with the National Building Code, TAC insurance requirements and NFPA standards, applying the most stringent requirement where they overlap.

02

Documentation & approvals

Drawings, hydraulic calculations and equipment schedules prepared in the format expected by the fire authority, including support for phased approvals.

Design process

From risk assessment to approval

Risk assessment

Identification of hazards and occupancy for each area, and selection of the protection strategy.

Hydraulics & sizing

Water demand, hydraulic calculations, pump and tank sizing, and detection layouts.

Detailed design

Hydrant, sprinkler, detection and special suppression design coordinated with HVAC and electrical.

Approvals

Drawings, calculations and documentation for fire authority and insurer approval.

Standards & software

Designed to recognised codes

NBC 2016 Part 4TAC RulesNFPA 13NFPA 14NFPA 20NFPA 72NFPA 750NFPA 2001NFPA 850IS 15105IS 3034AutoCADRevit
FAQ

Frequently asked questions

Which suppression system is suitable for electrical rooms?

Control rooms, switchgear rooms and data halls are usually protected by clean agent gas systems or water mist, which suppress fire without damaging sensitive electrical equipment.

Is transformer fire protection included?

Yes. We design protection for oil-filled transformers, such as high-velocity water spray or nitrogen injection systems, along with fire barrier walls and oil containment.

Do you prepare documents for fire NOC approval?

Yes. We prepare the drawings, hydraulic calculations and documentation required for fire authority submission and support the approval process.

How is fire protection coordinated with HVAC and electrical?

Fire detection signals are used to shut down ventilation, close dampers and isolate electrical supplies where required. These interfaces are defined and documented within the design.

Get in touch

Planning a fire protection system?

Share your requirements and we will provide a defined scope, programme and fixed fee for the design.