Industry Planning
Power master planning and electrical infrastructure design for new industrial parks, estates and factories — covering power demand, network layout and phased build-out.
Electrical infrastructure planned for the full life of the facility
The electrical arrangement chosen at the start of a project — substation capacity, network layout and earthing — sets the limits for every expansion that follows. Getting it right early avoids costly changes later.
DD Powertech works from the bulk supply point inwards, covering demand assessment, network architecture, substation design and a phased build-out plan that accommodates growth without replacing installed equipment.
Understanding industrial infrastructure planning
Planning an industrial park requires clear answers on how much capacity is needed at opening and at full build-out, which network layout best suits the expected mix of tenants, and where substations should be located.
Requirements vary with the type of facility. Heavy manufacturing needs a strong supply and high fault level, mixed-use estates need capacity that can be energised step by step, and data center campuses need redundancy at every level.
Our planning studies start from the master plan and deliver a demand forecast, a recommended network arrangement and a preliminary substation design that can be used in discussions with the utility.
Typical scope for industry planning
- Power demand assessment
- Network architecture design
- Load flow & capacity planning
- Phased build-out strategy
- Substation & distribution design
- 3D infrastructure coordination
- Utility connection support
- Provision for future load growth
Infrastructure planning scope
Power demand assessment
Estimation of peak demand from the planned equipment and tenant list using demand factors and load profiles, together with a growth forecast so the substation is sized correctly.
Network architecture selection
Comparison of radial, ring main, looped and meshed network options on cost, losses, fault level, protection and the ability to reconfigure the network.
Utility connection strategy
Definition of the technical requirements for supply voltage, fault level, metering and protection, so that the utility can respond to a clear and complete connection request.
3D infrastructure layout
A shared 3D model of substations, cable routes, duct banks and earthing, coordinated with roads, drainage and other services to avoid clashes on site.
From master plan to detailed design
Substation & switchgear design
Transformer sizing, switchgear, protection, metering, civil works and earthing, completed as construction drawings and procurement specifications.
Primary distribution design
Sizing and routing of the HV and MV cables and duct banks that distribute bulk power across the site, for both initial and full build-out loads.
Protection & metering design
Incomer and feeder protection, and metering at each tenant boundary, designed to meet utility and energy billing requirements.
Phased energisation strategy
Definition of the minimum initial capacity, first-phase works that avoid later disruption, the sequence of future additions and protection that works at every phase.
How we plan industrial infrastructure
Master plan review
Review of the site layout, plot sizes, planned industries and development phases.
Demand & network
Demand forecast, network option study and load flow and short circuit checks for each phase.
Utility connection
Connection requirements and preliminary substation design for discussion with the utility.
Detailed design
Substation, distribution, protection, metering and earthing design for the first phase and future expansion.
Planning to recognised standards
Frequently asked questions
At what stage should electrical planning start?
As early as possible — ideally alongside the site master plan. Decisions on substation location, supply voltage and cable corridors are much easier and cheaper to make before roads and plots are fixed.
How do you estimate demand when tenants are not yet known?
We use typical load densities and demand factors for the expected industry types, then refine the forecast as tenant information becomes available.
Can the network be built in phases?
Yes. We plan the full build-out network first, then define the first-phase works so that later additions connect without replacing equipment or interrupting existing tenants.
Can you support discussions with the electricity utility?
Yes. We prepare the demand forecast, connection requirements and preliminary substation design that the utility needs to assess and approve the supply.
Planning an industrial park or new facility?
Tell us about your project stage and we will outline how DD Powertech can support it.
Request a proposal
Tell us about your project and we'll respond with scope, timeline and next steps.