Service

Power System Studies

A complete suite of power system studies built from one validated network model — from load flow and short circuit to EMT and grid code compliance.

What we do

One model, every study your project needs

Every DD Powertech study starts from a single network model built from real equipment data and validated before analysis begins. Load flow, short circuit, protection, arc flash, harmonics and dynamic studies all draw on the same model — so results stay consistent from one report to the next.

Deliverables are prepared to the applicable grid code and international standards, in the format network operators, owners and lenders expect, and we stay on through comment resolution until the study is accepted.

Our approach

Connected studies, not isolated reports

Findings from one study feed the next — fault levels set protection settings, settings drive arc flash results, and harmonics shape filter and compensation design.

Shared base data

One validated model and data register for the whole project, so every study uses the same equipment data and assumptions.

Load flow as the foundation

Steady-state results establish operating scenarios for short circuit, protection, dynamic and EMT work to IEC 60909, IEEE 242, IEEE 1584, IEEE 519 and IEC 60071.

Results you can act on

Each study ends in actions — setting sheets, mitigation designs and compliance evidence — not just tables of results.

Study disciplines

Every study we deliver

01

Load flow analysis

Steady-state voltages, equipment loading, losses and power flows across normal, contingency and future operating scenarios.

Explore this study
02

Short circuit analysis

Symmetrical and asymmetrical fault levels to IEC 60909 and ANSI/IEEE, with switchgear duty and withstand verification.

Explore this study
03

Protection & relay coordination

Graded, selective relay settings with TCC curves and setting sheets — from the grid interface to outgoing feeders.

Explore this study
04

Arc flash (IEEE 1584)

Incident energy, arc-flash boundaries, PPE categories and ready-to-print warning labels for every bus.

Explore this study
05

Motor starting analysis

Voltage dip, acceleration time and starting method checks for large HT motors, pumps and compressors.

Explore this study
06

Harmonic analysis

Harmonic distortion assessment against IEEE 519 and utility limits, with filter sizing and mitigation design.

Explore this study
07

Transient & dynamic stability

Rotor-angle, voltage and frequency stability after faults, generator trips and load-shedding events.

Explore this study
08

Electromagnetic transients (EMT)

Switching, energisation, inrush and control-interaction studies in PSCAD at microsecond resolution.

Explore this study
09

Insulation coordination

Overvoltage assessment, surge arrester selection and insulation levels to IEC 60071.

Explore this study
10

Earthing & CDEGS

Earthing grid design, soil modelling, GPR and touch and step potential analysis to IEEE 80.

Explore this study
11

Reactive power & voltage

Reactive capability, compensation sizing and voltage-profile optimisation at the point of connection.

Explore this study
12

Grid code compliance

Studies demonstrating LVRT/HVRT, frequency response and power quality to CEA, CTU/STU and international grid codes.

Explore this study
13

Grid impact study

Effect of a new generator or large load on network fault levels, voltages, line loading and existing protection.

Explore this study
14

Third-party protection audit

Independent review of relay settings, coordination and configuration against the current network.

Explore this study

Need a full study package?

Send us your SLD and scope — we will recommend the right set of studies for your project and utility.

Request a proposal
What you receive

Deliverables with every study

Study report

Methodology, assumptions, results tables and clear conclusions, structured to what the utility or reviewer expects.

Setting sheets

Relay setting sheets and coordination curves ready for the commissioning team to apply.

Mitigation design

Filter, compensation, arrester or protection changes sized and specified where a study shows a problem.

Native model files

The validated network model in ETAP, PowerFactory, PSCAD or PSS/E, handed over for future use.

Standards & software

Accepted by utilities and lenders

ETAPDIgSILENT PowerFactoryPSCADPSS/ECDEGSIEC 60909IEEE 242IEEE 1584IEEE 519IEC 60071IEEE 80CEA Grid Standards
FAQ

Power system studies — what clients ask us

Which studies are required for grid connection in India?

Most connections need load flow, short circuit, reactive power capability, ride-through (LVRT/HVRT) and power quality studies submitted to the CTU or STU. Larger renewable and storage plants increasingly also need PSCAD/EMT models and studies.

How long does a typical study take?

A single study such as short circuit or relay coordination usually takes 1–3 weeks once complete data is received. A full grid-connection study set typically takes 4–8 weeks, depending on plant size and utility requirements.

Which software do you use?

ETAP, DIgSILENT PowerFactory, PSCAD and PSS/E for network studies, and CDEGS for earthing. Where a utility or client specifies a tool, we model in that tool and hand over the native files.

Do you work on projects outside India?

Yes. We deliver studies to IEC, IEEE and the applicable national grid codes for projects in the Middle East, Africa, Europe and Asia, and remote-coordinate with local teams and utilities.

What data do you need to start?

An SLD, transformer and cable data, generator or inverter data, utility fault levels and the protective device list. Where data is missing we apply documented typical values and flag them clearly in the report.

Can you handle grid code compliance for solar and wind plants?

Yes. We prepare the complete compliance study set, validated inverter and plant-controller models, and respond to utility comments until the studies are accepted.

Do arc flash studies include labels?

Yes. Every arc flash study includes incident energy results, PPE categories and print-ready labels for each piece of equipment studied.

How are your fees structured?

Studies are usually quoted as a fixed lump sum per study or study package, based on the network size and scope. Comment resolution with the utility is included in the quote.

Get in touch

Discuss your project with DD Powertech

Share your SLD and the studies you need — we'll come back with a clear scope, timeline and proposal.

4 499/5, Vinobha Nagar,
Koduvai, Tamil Nadu 638660, India

Request a proposal

Tell us about your project and we'll respond with scope, timeline and next steps.